Brand New, individually boxed, The VoIP Lounge Replacement Handset with curly cord for Mitel 5300 Series IP Phones including 5304, 5312, 5320, 5320e, 5324, 5330, 5330e, 5340, 5340e, and 5360. Official The VoIP Lounge brand – Look for The VoIP Lounge logo on the box. Quantity orders may be bulk packed for shipping.
Brand New – Individually Boxed
Black Color
Also compatible with Mitel 5212 and 5224 Phones
Official The VoIP Lounge brand – Look for The VoIP Lounge logo on the box
Compare“Yealink W56H Dect Cordless Handset” has been added to the compare list
Back to products

Aastra 6737i IP Phone - Cable - Desktop, Wall Mountable (Renewed)
$109.95 Original price was: $109.95.$29.95Current price is: $29.95.
The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360
$21.99
Compare
Category: Cordless Phones
Brand: The VoIP Lounge
Description
Reviews (0)
Be the first to review “The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360” Cancel reply
Shipping & Delivery
MAECENAS IACULIS
Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.
ADIPISCING CONVALLIS BULUM
- Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
- Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
- Diam parturient dictumst parturient scelerisque nibh lectus.
Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.
Related products
AT&T DL72319 DECT 6.0 3-Handset Cordless Phone for Home with Connect to Cell, Call Blocking, 1.8″ Backlit Screen, Big Buttons, intercom, and Unsurpassed Range
$82.95
Cisco Unified Wireless IP Phone 8821 – Cordless Extension Handset – Bluetooth Interface – 2.4″ Black CP-8821-K9 (Renewed)
$431.95
Grandstream DP730 DECT Cordless VoIP Telephone
$81.97
Grandstream Ruggedized WiFi Phone, 2.8 in Screen, Bluetooth WP836
$147.99
Grandstream WP820 Wireless Wi-Fi Phone
$98.99
Panasonic Expandable Cordless Phone System with Amber Backlit Display – 2 Handsets – KX-TGC352B (Black)
Yealink IP Phone W73P Bundle of W70B Base and W73H handset + 1-Unit W73H Handset
$262.00
Reviews
There are no reviews yet.