Brand New, individually boxed, The VoIP Lounge Replacement Handset with curly cord for Mitel 5300 Series IP Phones including 5304, 5312, 5320, 5320e, 5324, 5330, 5330e, 5340, 5340e, and 5360. Official The VoIP Lounge brand – Look for The VoIP Lounge logo on the box. Quantity orders may be bulk packed for shipping.
Brand New – Individually Boxed
Black Color
Also compatible with Mitel 5212 and 5224 Phones
Official The VoIP Lounge brand – Look for The VoIP Lounge logo on the box
Compare“Grandstream DP750 Long-range DECT Base Station + DP720 2-UNITS DECT HD Handset” has been added to the compare list
Back to products

Aastra 6737i IP Phone - Cable - Desktop, Wall Mountable (Renewed)
$109.95 Original price was: $109.95.$29.95Current price is: $29.95.
The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360
$21.99
Compare
Category: Cordless Phones
Brand: The VoIP Lounge
Description
Reviews (0)
Be the first to review “The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360” Cancel reply
Shipping & Delivery
MAECENAS IACULIS
Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.
ADIPISCING CONVALLIS BULUM
- Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
- Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
- Diam parturient dictumst parturient scelerisque nibh lectus.
Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.
Related products
Cisco Unified Wireless IP Phone 8821 – Cordless Extension Handset – Bluetooth Interface – 2.4″ Black CP-8821-K9 (Renewed)
$431.95
Grandstream DP720 Dect Cordless VoIP Telephone,Black
$42.99
Ooma Telo VoIP with 3 HD3 Handsets Complete Home Phone System for Unlimited Nationwide Calling, Mobile App Access, and Robocall Blocking Affordable Landline Replacement
Panasonic Cordless Phone with Answering Machine, Advanced Call Block, Bilingual Caller ID and Easy to Read High-Contrast Display, Expandable System with 3 Handsets – KX-TGD833M (Metallic Black)
VTech CS6719-2 2-Handset Cordless Phone with Caller ID/Call Waiting, Handset Intercom & Backlit Display/Keypad, Silver
$41.95
Yealink AX83H IP Phone – Cordless – Wi-Fi, Bluetooth – 5 Multiple Conferencing – Wall Mountable, Stand Mountable
$125.63
Yealink SIP-T34W WiFi IP Phone – Power Adapter Included – 4 VoIP Accounts. 2.4-Inch Color Display. Dual-Port Gigabit Ethernet, 802.3af PoE, (SIP-T34W-PSU)
$93.74
Reviews
There are no reviews yet.